|
|
I am currently working on the following problems and methods:
- Project scheduling maximising net present value
- Resource constrained multiple machine job scheduling
- Parallelizing ant colony optimization and Beam search
PhD: Hybrids of Stochastic Metaheuristics and Constraint Programming for Combinatorial Optimization
Algorithms
- Ant colony optimization
- Constraint programming
- Beam search
- Hybrids of the above
Case studies
- Single machine job scheduling with sequence dependent setup
times, also known as the asymmetric traveling salesman problem with
time windows
- Resource constrained mutiple machine job scheduling
- Car sequencing
Masters: Modeling Connectivity in the Brain: An Application in Huntington’s Disease
Examined differences in connectivity in prefrontal brain regions between
Huntington's disease patients and healthy controls over a two year
period. We examined structural equation modeling and dynamic causal
modeling
Honours: Mining Negative Rules in Large Databases using GRD
|